3
algebraA bakery makes bread () and cakes (). It takes 1 hour to make bread and 2 hours to make a cake. They have at most 10 hours available. They want to make at least 2 loaves of bread. Which system models this?
A
and
B
and
C
and
D
and
Correct Answer: A
Choice A is the correct answer. Translate constraints into inequalities.
- Time Constraint: (bread) + (cake) (hours).
- Quantity Constraint: Bread () at least 2.
- System: and
?�� Strategic Tip: Match the coefficients to the correct variables (1 hour for bread, 2 for cake).
Choice B is incorrect because means they must work more than 10 hours. Choice C is incorrect because it swaps the time coefficients. Choice D is incorrect because it puts the quantity constraint on cakes () instead of bread.